• Skip to primary navigation
  • Skip to main content

Saskatoon Freeway

  • Home
  • About the Study
    • Phase 1
    • Phase 2
    • Current Reports
    • River Crossing
  • Map
  • FAQ
  • News
  • Sign up for alerts
  • Contact
  • Show Search
Hide Search

Current Reports

As reports are published and become publicly available, they will be posted here.

Final draft report for Phase 1 – Saskatoon Freeway Functional Planning Study

The Ministry of Highways has published the final draft report for Phase 1 of the Saskatoon Freeway Functional Planning Study. The Ministry has incorporated all feedback into this final draft report from the various Technical Working Groups (TWGs) and both the Technical and Steering Committees. The Ministry has provided this final draft report to impacted city and rural municipality councils for their review and formal endorsement.

20210729-659183_SFFPS_Phase_1_Functional_Design_Report_Final_V02_Reduced_signed-PS_2

Download
20210729-659183_SFFPS_Phase_1_Functional_Design_Report_Final_V02_Appendices-PS

Download

Environment and Regulatory Review – Saskatoon Freeway Functional Planning Study

20200831_659183_SFFPS_Env_Reg-Review_FINAL-compressed

Download

Habitat Evaluation of the Saskatoon Freeway Project Through the Northeast and Small Swale Complexes – 2020 Report

Habitat-Evaluation-of-Saskatoon-Freeway-Through-Small-And-Northeast-Swale-Meewasin-Final-04-27-2020-redacted

Download

Newsletter

Sign up for our newsletter to stay up to date on developments.

Sign up
  • Facebook
  • Instagram
  • LinkedIn
  • Twitter

Copyright © 2023 ยท Saskatoon Freeway

  • Terms and Conditions
  • Privacy Policy
0 shares