• Skip to primary navigation
  • Skip to main content

Saskatoon Freeway

  • Home
  • About the Study
    • Phase 1
    • Phase 2
    • Phase 3
    • Current Reports
    • River Crossing
  • Map
  • FAQ
  • News
  • Sign up for alerts
  • Contact
  • Show Search
Hide Search

Share your thoughts on the Saskatoon Freeway by March 2

Saskatoon Freeway · Feb 23, 2021 ·

There is only one week left to take part in an online public consultation focusing on Phase 2 of the Saskatoon Freeway Functional Planning Study.

Click on this link to join the conversation; the public online consultation will close on March 2. [Now closed]

Phase 2 of the Functional Planning Study is highlighted in green on the map below.

Your feedback – captured through surveys and a LiveChat function that’s part of the public consultation website – will be used to help us prepare a preferred route for Phase 2 and interchange configurations.

When built, the Saskatoon Freeway is expected to be a 55-kilometre divided highway, with a minimum of four lanes, that begins at Highway 11 south of Saskatoon and connects with Highway 7 west of the city. Construction is not anticipated for at least 15 years.

News online public consultation, Phase Two

Newsletter

Sign up for our newsletter to stay up to date on developments.

Sign up
  • Facebook
  • Instagram
  • LinkedIn
  • Twitter

Copyright © 2025 · Saskatoon Freeway

  • Terms and Conditions
  • Privacy Policy